115 Volt AC Power Sequencer 300-1011
Pulizzi Engineering PC874
Outlet Side
Control Side
Notes
- Requires AC outlet NEMA L5-30R, 30A, 125V.
- Any conversion to the Data Center Cabinet, including replacement of the AC
Power Plug or AC Power Sequencer, voids all safety agency approvals.
- The Switched 2 output comes on after a 5 second delay.
References
- Installation Manual for the Sun Full-height Rack System, 800-1555.
- Installation Manual for Sun Rackmountable Fileservers, 800-1556.
- Sun Full-Height Rack System Installation Manual, 800-1677.
- Sun Rackmountable Fileservers Installation Manual, 800-1676.
- Sun 900 Mbyte Disk Drive Installation Manual, 800-1036.
Last updated: December 2, 1996
|